Industry positioning
For satellite manufacturers (whole-satellite assembly organizations / commercial satellite companies), we provide validation capabilities for ground integration testing of whole-satellite communication systems and whole-satellite factory acceptance testing.
Industry challenges
After communication satellite assembly and before factory release and launch, whole-satellite ground integration testing and environmental testing (thermal vacuum and vibration) must be completed to validate functionality and performance under space and launch mechanical environments. The central challenge is a repeatable, quantifiable counterpart environment that can simulate large numbers of ground terminals. Using real terminals for whole-satellite testing entails unacceptable cost and complexity.
These customers aim to deliver complete satellites: after final assembly, ground integration testing of the communication system and factory environmental testing must be completed before delivery for launch. In recent years, commercial satellite companies (enterprises independently developing complete communication satellites) have become the main source of customers in this category. Their rapid development cycles and frequent model iterations impose higher requirements on test environment reproducibility and delivery efficiency.
Unlike payload unit validation, whole-satellite testing focuses on system-level behavior after the “spaceborne base station + onboard core network (4G / 5G / NTN / 6G) + platform” have been integrated. Issues often occur at whole-satellite interfaces and during joint debugging that component-level tests do not cover.
Application scenarios
① Ground integration testing of whole-satellite communication systems
- Functional, performance and system reliability validation of the whole-satellite communication link after the spaceborne base station and core network (4G / 5G / NTN / 6G) are integrated
- Whole-satellite ground validation of scenarios such as multi-terminal access, uplink and downlink services, handovers, and uplink MCS sweeps
- Whole-satellite validation of multi-beam and beam-position management capabilities
- End-to-end integration testing across the ground segment, onboard core network, spaceborne base station and terminal simulator
② Satellite factory acceptance testing
The core of satellite factory acceptance testing is to validate the whole-satellite communication system under simulated orbital and launch environments. Typical test procedures and content include:
Test environment
- Place the complete satellite in a vacuum chamber to simulate orbital vacuum and temperature conditions
- After the onboard core network (4G / 5G / NTN / 6G) and spaceborne base station are integrated, the complete satellite enters the environmental testing process
Thermal vacuum testing (high vacuum + extreme high/low temperature cycling)
- High-temperature environment: simulate extreme conditions under direct sunlight
- Low-temperature environment: simulate low-temperature conditions in Earth’s shadow
- Alternating high and low temperatures: simulate rapid temperature changes when entering and leaving eclipse
- Test content: continuous UE simulator access, uplink-only services, downlink-only services, simultaneous uplink/downlink services, and uplink MCS sweeps
Vibration testing (simulating rocket launch and flight vibration environments)
- Comparison before and after testing: verify whether communication functions and performance remain stable after the satellite structure, equipment, mounting connections, cables and mechanisms have been exposed to the vibration mechanical environment
Testing value
- Expose issues before satellite factory release, including access failures, signaling anomalies and core network interface anomalies, which are often not detected in component-level R&D testing
- Cover key orbital positions to validate communication functionality, performance and system reliability under simulated orbital conditions
Verifiable facts
| Test item | Result |
|---|---|
| Continuous UE simulator access | Continuous access succeeded at high/low temperatures and before/after vibration |
| Downlink-only service | Measured downlink rates on the order of 168 M / 169 M |
| Uplink-only service | Measured uplink rates on the order of 118 M ~ 164 M (depending on the base station k-offset mode) |
| Simultaneous uplink/downlink services | Uplink on the order of 112 M / downlink on the order of 154 M |
| Uplink MCS sweep | Sweeps of 27 / 23 / 15 / 10 / 8, covering 64QAM / 16QAM / QPSK modulation |
Success stories
| Case | Content |
|---|---|
| A new experimental communication satellite · Whole-satellite environmental testing and in-orbit mode validation | Thermal vacuum + vibration + in-orbit mode validation, covering the onboard core network and Ka-band base station |
